D.U.
Kit ®
can be installed on any substrate,
its height or angle of incline/decline are predetermined and calibrated
before the concrete is poured.
D.U.
Kit ®
can also be used for a topping layer over precast and first layers
of concrete.
Placement of the D.U.
Kit®
rails can be within
any desired intervals.
THE
RECOMMENDED INTERVALS BETWEEN THE PROFILES ARE 3-4 METERS AND FOR
BASES ALONG THE PROFILE BETWEEN 1-1.5 METERS.
D.U.
Kit ®
Constructive kits are
used as side casting molds and as Separators between stretches of
concrete to be poured in consecutive order. When required they also
have the added option of holes for dowel bars and holders to keep
the dowel bars horizontal.
Connection to the
bases enables accurate height adjustment.
|